buy-again

My lists

interrogation

Customer Service

'OfficePlaner' Card Planning Board, 7 modules

'OfficePlaner' Card Planning Board, 7 modules

‌
Legamaster Premium Annual Vertical Planning Board 60x90cm

Legamaster Premium Annual Vertical Planning Board 60x90cm

‌
'Jetplaner' planning and project board

'Jetplaner' planning and project board

‌
Legamaster Premium Annual Planning Board 53 Weeks 60x90cm

Legamaster Premium Annual Planning Board 53 Weeks 60x90cm

‌
Legamaster Professional Annual Horizontal Planning Board 90x120cm

Legamaster Professional Annual Horizontal Planning Board 90x120cm

‌
T-card planning board, (L)1.008 x (H)783 mm

T-card planning board, (L)1.008 x (H)783 mm

‌
<p>Nobo T Card Planning 12-Month Kit</p>

<p>Nobo T Card Planning 12-Month Kit</p>

‌
Standard multifunctional planning, 10 strips

Standard multifunctional planning, 10 strips

‌
Multi-use T-card planning - index 2 - 10 columns Nobo

Multi-use T-card planning - index 2 - 10 columns Nobo

‌
Planning board with T-cards, (L)315 x (H)780 mm

Planning board with T-cards, (L)315 x (H)780 mm

‌
T-card planning board, (L)474 x (H)780 mm

T-card planning board, (L)474 x (H)780 mm

‌
Standard multi functional planning, 5 strips

Standard multi functional planning, 5 strips

‌
Planning board with T-cards, (L)819 x (H)780 mm

Planning board with T-cards, (L)819 x (H)780 mm

‌
Hebdo-Malin Mini Lab 21 x 15 cm - Visual

Hebdo-Malin Mini Lab 21 x 15 cm - Visual

‌
Magnetic Monthly Planner Desq 40x50cm

Magnetic Monthly Planner Desq 40x50cm

‌
Mini T-card planning board- 2 panels, 8 columns of 17 slots, index 1.5 - Nobo

Mini T-card planning board- 2 panels, 8 columns of 17 slots, index 1.5 - Nobo

‌
Multifunctional planner for T-cards foldable 2 x 10 columns Nobo

Multifunctional planner for T-cards foldable 2 x 10 columns Nobo

‌
T-Card for planning Djois Format 2 48mm yellow 100 pieces

T-Card for planning Djois Format 2 48mm yellow 100 pieces

‌
Nobo planning board index 3, 32 slots, size 66 x 9.6 cm

Nobo planning board index 3, 32 slots, size 66 x 9.6 cm

‌
T-card planning board, (L)315 x (H)490 mm

T-card planning board, (L)315 x (H)490 mm

‌
Djois Weekly Planner 20 Slots Gray

Djois Weekly Planner 20 Slots Gray

‌
Post-it Super Sticky Meeting Notes, 70 sheets, size 203 x 153 mm, assorted colors, pack of 3 pads

Post-it Super Sticky Meeting Notes, 70 sheets, size 203 x 153 mm, assorted colors, pack of 3 pads

‌
Post-it Super Sticky Note Pad 6445 152x101mm assorted 3 pieces

Post-it Super Sticky Note Pad 6445 152x101mm assorted 3 pieces

‌
T-Card for planning Djois Format 2 48mm orange 100 pieces

T-Card for planning Djois Format 2 48mm orange 100 pieces

‌
A5 Notepad Clear Roar - Visual

A5 Notepad Clear Roar - Visual

‌
T-Card for planning Djois Format 2 48mm green 100 pieces

T-Card for planning Djois Format 2 48mm green 100 pieces

‌
Post-it Super Sticky Memo Pads 6445 152x101mm Assorted 4 Pieces

Post-it Super Sticky Memo Pads 6445 152x101mm Assorted 4 Pieces

‌
T-card planning, card size 3, 54 slots

T-card planning, card size 3, 54 slots

‌
T-Card for Planning Djois Format 2 48mm Pink 100 Pieces

T-Card for Planning Djois Format 2 48mm Pink 100 Pieces

‌
Legamaster Premium Project Planning Board 60x90cm
Legamaster Premium Project Planning Board 60x90cm

Legamaster Premium Project Planning Board 60x90cm

Ref. 804-7988

‌
Legamaster

Description and features

* Magnetic planning board and whiteboard in one. * Ideal for short-term planning for 5 people or 5 projects. * Dimensions per slot 20x110mm. * With anodized aluminum frame. * Includes tray, accessories, and mounting hardware.

More information

You are currently visiting the page Legamaster Premium Project Planning Board 60x90cm of the category Multifunctional plannings
Have you considered checking out the following categories: Annual planning, Weekly plannings, Monthly plannings, Accessories for planning